Operating & Maintenance Manual
Operating Instructions
28
Winch Operating Instructions
Manual Operation
SET-UP (Prior to Raising Tower):
•
Inspect cables.
•
Ensure no obstruction overhead within 40 feet.
•
Mount lamps on cross bar and aim as desired. (L6, L8 &L20 only)
•
Extend both outriggers and insert locking pins fully.
•
Level unit using jacks and bubble level indicator.
•
Jacks must support entire unit weight (tires off the ground).
•
Remove pin D.
•
Remove pin C.
DANGER
!
Do NOT raise or position tower under electrical power lines.
KNOB-SCREW E
PIN D
TOWER REST
WINCH B
LS & LSC
L8, L6 & L20
LS & LSC
PIN C
WINCH A
PIVOT PIN
CABLE
Summary of Contents for L6-60HA-T4F
Page 2: ...2 ...
Page 4: ...4 ...
Page 5: ...5 Foreword ...
Page 8: ...Operating Maintenance Manual Foreword 8 ...
Page 9: ...9 Safety ...
Page 18: ...18 ...
Page 19: ...19 General Data ...
Page 21: ...21 Operating Instructions ...
Page 35: ...37 Maintenance ...
Page 45: ...47 Troubleshooting ...