34
INSTRUCTIONS JIB CRANE SERIES GBA - GBP
MAN05MGO5
$YNAMICTESTRUNS
• prepare adequate weights for the test runs with load equal to
nominal lifting capacity x 1,1
and suitable
equipment for the harnessing and lifting of the load.
•harnesstheload,takingcaretopositionthehookverticallytoavoidskewropefalls.
•
slowly tension the sling so as not to cause tearing, if available do the test runs with load using the “slow” speed.
•slowlylifttheloadandcheckthatthishappenswithnodifficultyandthattherearenoanomalousnoises,clear
deformations or sagging in the structure of the crane, in the support structures and/or the anchorings.
•repeatthetestrunatmaximumspeed,ifavailable,doingtheprecedingchecks.
•
check the functionality of the “ascent and descent” limit switches, when installed, and/or any clutch device fitted.
•checkthefunctionalityoftheliftingbrake,checkingthattheweightisbrakedinadequatetimeandthatthereis
no skidding of the load, after releasing the button.
• carry out the same checks also for the trolley travelling movements and rotation of the arm, checking the
functionality of the limit switches, without bringing the load to the maximum height (lift it to a height of one metre
from the ground).
•operatefirstatslowspeed,ifavailable,andthenatmaximumspeed.
•checkthecorrectslidingofthetrolleyonthegirder,andascertainthattherearenonoanomalousnoises,evident
permanent deformations or anomalous sagging of the structure of the crane, of the support structure and/or the
anchorings.
•checkthefunctioningofthe“emergencystop”buttonwhichmuststopandinhibitallthemovements.Any
function of the hoist and/or trolley must stop, in the shortest possible time and space, without showing anomalies,
side skids, dangerous oscillations, etc. which threaten the stability.
•checkthebrakingspacesandstoppingspacesduringliftingtravellingandrotation,checkingthestabilityofthe
mass manoeuvred.
3TATICTESTRUNS
•usesuitablemassesforthetestrunsequalto:
nominal lifting capacity x 1,25
and suitable equipment for slinging
and lifting the load.
•putintheslingtheload
used for the dynamic test runs
(nominal capacity x 1,1) taking care to position the
hook on the vertical to avoid skew runs.
•tensiontheslingslowlytoavoidtearing,ifavailablecarryoutthetestrunsusingthe“slow”speed.
•lifttheloadandstopitinasuspendedpositionataheightof10cm.
•graduallyapplyweightonituntilreachinganoverloadvalueequalto25%ofthenominalliftingcapacity
•leavetheweightsuspendedfornolessthan10minutes.
•checkthattheweightsuspended(load+overload)doesnotyield(theliftingbrakeandtheclutchdevice/load
limiting switch, if installed, must not skid).
•releasetheloadandcheckthattherearenoevidentdeformationsand/orsaggingofthestructuresofthecrane,
the support structures and/or the anchorings.
Thedynamictestrunmustbecarriedoutinthemostunfavourableloadconditions,thatiscombining
lifting, travelling and rotation.
•DuringthestatictestrunNOmovementofthecranemustbeactivated.
•Thetestingofthejibcranemustberepeatedattheannualchecks
(see paragraph 6.3.2).
KMAN05MG05