MAN05MGO5
INSTRUCTIONS JIB CRANE SERIES GBA - GBP
53
•Checkthewearoftherollingbandsofwheelsandguiderollers.
•Checktheballbearingswhichmustbesubstitutedincaseofextremenoiseorextremefriction,“stick-slip-
motion”, difficult and/or irregular rotation.
•Checkthattheendstopsarenotdeformedandthattherearenosignsofsaggingintheirfixingtothestructures
and that the buffer is intact and fixed well to its support.
Quarterlycheckoftheefficiencyofthewheelsandtheguiderollersofthe“channel”
trolleys
(fig. 80)
:
Annualcheckoftheefficiencyofthetrolleybuffers
(fig. 81)
:
Replacewheelsand/orguiderollersofthe“channel”trolleyif:
•Therollingdiameterofthewheelshowsawearequaltoorgreaterthan5mm
•Therollingdiameteroftheguiderollershowsawearequaltoorgreaterthan2mm
•Ifitisnecessarytoreplaceevenonewheelonly,itisrecommendedtoreplacealltrolley
wheels in order to guarantee the best performance and life.
Replacethebufferswhenthereare:
•signsofbreakingorpermanentdeformation,cuts,abrasion,incisions
DONATI
TECHNICIAN
DONATISERVICE
fig.80
fig.81
KMAN05MG05