EN
8
BIOCLASS iC DX
2
INSTALLATION INSTRUCTIONS
The boiler must be installed by personnel authorised by the Ministry of Industry, in compliance with the
applicable laws and regulations.
This boiler is suitable for heating water to a temperature below boiling point at atmospheric pressure. It
must be connected to a heating installation and/or a domestic hot water distribution network, which must
always be compatible with its performance and power.
This appliance must only be used for the purpose for which it has been expressly designed. Any other use
is considered unsuitable and therefore hazardous. The manufacturer shall not be considered liable under
any circumstances for damage caused by unsuitable, erroneous or irrational use.
Remove all the packaging and check the contents are complete. In case of doubt, do not use the boiler.
Contact your supplier. Keep the packaging elements out of reach of children, as they can be dangerous.
When you no longer wish to use the boiler, disable the parts that could be a potential source of hazard.
2.1
Location
The boiler must be installed in a sufficiently ventilated site, away from humidity. It must be located so
that the air grilles on the premises are not obstructed and normal boiler maintenance is possible even
if it is placed between items of furniture. One metre of free space must be left above the boiler for this
purpose. In the case of locating the boiler between furniture or walls, the reserve tank with the feeder
must be previously installed next to the boiler.
If you want to connect the boiler to the
iConnect
Internet platform or register it in the
iConnect
user
application, there must also be
coverage of the home's Wi-Fi network
in the room where the boiler
is located.
2.2
Hydraulic installation
The hydraulic installation must be made by qualified personnel. The applicable installation legislation is
to be complied with, and the following recommendations should also be taken into account:
•
The inside of the installation piping should be thoroughly cleaned before switching on the
boiler.
•
We recommend inserting cut-off valves between the installation piping and the boiler to
simplify maintenance tasks.
•
Leave a free space around the boiler for carrying out any maintenance and repair operations.
•
Drain valves and suitable devices for correctly bleeding the air from the circuit during the
boiler filling stage should be fitted.
•
Install all the necessary safety elements (expansion vessel, safety valve, etc.) to comply with
the applicable regulations for the installation.
•
If the boiler is installed at a lower height than the heating installation, it is recommendable
to create a siphon at the boiler outlet, to prevent the installation from heating up due to
natural convection when heating is not required.