BR342 Ducted Installation Instructions
Installing the Unit
•
Check gasket alignment of the unit over the roof opening and adjust if
necessary. Unit may be moved from below by slightly lifting. See FIG. 7.
•
Remove return air cover and ceiling template from carton. See FIG. 8.
•
The unit is fixed using a four (4) bolt pattern for installing the RAG kit. These
bolts and the electronic wall control are supplied separately.
•
Reach up into the return air opening and pull the unit electric cord and control
cables down for later connection. See FIG. 9.
14
FIG. 7
FIG. 8
FIG. 9