30
30
The adjustment of the required functions is
made by rotational switches, e.g. the setting
of the max. time to activate the remote
control or the max. bridging time for access
control is done with switches A.
Platte
M2347_a
M9409
0
3
6
9
0
3
6
9
0
3
6
9
0
3
6
9
ch1
ch2
B
A
Attention
Adjustment must only be carried out
by trained staff while the unit is
disconnected from power. Before
opening the front of the unit potential
equalisation must be made.
2.9
Set up of safety module
The adjustment of the required functions is
made by rotational switches, e.g. the setting
of the max. time to activate the remote
control or the max. bridging time for access
control is done with switches A.
Platte
M2347_a
M9409
0
3
6
9
0
3
6
9
0
3
6
9
0
3
6
9
ch1
ch2
B
A
Attention
Adjustment must only be carried out
by trained staff while the unit is
disconnected from power. Before
opening the front of the unit potential
equalisation must be made.
2.9
Set up of safety module
Summary of Contents for BI 5910
Page 129: ...129 129 Appendix Appendix...