18.7 TEST LOADING INSTRUCTIONS FOR REGULAR INSPECTION
1.
Place the lift on an even surface with good carrying capacity. Drive the outriggers to their lowest
position (the minimum support width).
2.
Raise the boom, turn it to the side from the transport support and lower it to the ground.
3.
Put a weighed load of 215 kg on the platform (I).
4.
Lift the boom to as high as it goes and extend the telescope to its full length (maximum lifting
height).
5.
Lower the boom until the safety device stops the movement.
6.
Turn the boom round over 360°.
7.
Retract the telescope and lower the boom to a horizontal position.
8.
Extend the telescope until the safety limit switch RK4 stops the movement. Establish the standing
stability in this situation by turning the lift round over 360°.
9.
Carry out the same procedure with a platform load of 80 kg (II).
10.
Compare the outreach with the reach diagram. If necessary, readjust according to instructions in
point "Adjustment of the outreach and overload limit switches".
After the above mentioned test loadings (case I and case II) and the subsequent inspection have been
completed without finding any defects in the structure or stability of the lift, the lift may be used inside
the permitted operating range presented in the reach/platform load diagram of this manual.
The max. allowed platform load is 215 kg
-
in conjunction with the first, i.e. start-up inspection, the lift shall be subjected to a test loading
with an overload of 25% and after that the supporting structures shall be thoroughly inspected
-
in conjunction with every annual inspection the lift shall be subjected to a test run with
maximum permissible load and after that the supporting structures shall be thoroughly inspected
-
the first inspection shall be recorded in the start-up inspection protocol and the test-run shall be
recorded in the protocols for the annual and regular inspection
Summary of Contents for 240RXT
Page 2: ...DINO 240RXT 2...
Page 3: ...DINO 240RXT 3 ORIGINAL OPERATING INSTRUCTIONS Valid from serial number 24040...
Page 7: ...DINO 240RXT 7 2 REACH DIAGRAM...
Page 8: ...DINO 240RXT 8 3 DIMENSION DRAWING...
Page 18: ...DINO 240RXT 18 S20 S18 S17 S19 S16 Q2 H6 H3 S30 S13 S1 OK2...
Page 36: ...DINO 240RXT 36 Notes...
Page 39: ...DINO 240RXT 39 17 3 LUBRICATION PLAN...
Page 41: ...DINO 240RXT 41 1...
Page 58: ...DINO 240RXT 58 Notes...
Page 60: ...DINO 240RXT 60 18 2 SAMPLE OF INSPECTION PROTOCOL FOR THE ACCESS PLATFORM...
Page 61: ...DINO 240RXT 61...
Page 83: ...DINO 240RXT 83 21 ELECTRIC DIAGRAM 24021...
Page 84: ...DINO 240RXT 84...
Page 85: ...DINO 240RXT 85...
Page 86: ...DINO 240RXT 86...
Page 87: ...DINO 240RXT 87...
Page 88: ...DINO 240RXT 88...
Page 89: ...DINO 240RXT 89...
Page 90: ...DINO 240RXT 90...
Page 91: ...DINO 240RXT 91...
Page 92: ...DINO 240RXT 92...
Page 93: ...DINO 240RXT 93...
Page 94: ...DINO 240RXT 94...
Page 95: ...DINO 240RXT 95...
Page 96: ...DINO 240RXT 96...
Page 97: ...DINO 240RXT 97...
Page 98: ...DINO 240RXT 98...
Page 99: ...DINO 240RXT 99...
Page 100: ...DINO 240RXT 100...
Page 101: ...DINO 240RXT 101...
Page 102: ...DINO 240RXT 102...
Page 103: ...DINO 240RXT 103...
Page 104: ...DINO 240RXT 104...
Page 105: ...DINO 240RXT 105...
Page 106: ...DINO 240RXT 106...
Page 107: ...DINO 240RXT 107 Notes...
Page 110: ...DINO 240RXT 110 24 HYDRAULIC DIAGRAM BOOM OPERATION No 24013...
Page 112: ...DINO 240RXT 112 26 HYDRAULIC DIAGRAM BOOM OPERATION WITH OPTIONAL EQUIPMENT No 24010...
Page 113: ...DINO 240RXT 113 Notes...