DINO 240RXT
29
-
retract the platform to inside the operating range of the RK4 by pushing the "telescope in" -
button (S30 or S31)(the red signal light stops flashing)
-
after this the lift may be operated normally
The "telescope in" -button (S30 or S31) is always operational when the engine is running.
9. Refer to the item "Daily inspections" in the task list for servicing.
10. With the boom slightly lifted and the telescope extended, make sure that the platform does not
lower of itself while the operating controls are not being used.
11. When working under cold weather conditions, let the engine run for a while without load to
increase the hydraulic oil temperature. Start the operations by driving the movements carefully
without load back and forth from the chassis control panel.
12. Move the platform to the work object
The platform movements can be operated with continually adjustable speed from the platform control
panel (not from the chassis control panel). The movements can be operated simultaneously. If several
control levers are operated simultaneously, the speed of individual movements decreases.
DO NOT TAKE ADDITIONAL LOAD IN THE UPPER POSITION!
NOTE!
Lowering the platform to transport position: Always before lowering the boom onto the transport
support, retract the telescope completely and turn the platform perpendicular to the boom.
13. Observe when lifting the platform
-
the operating range of the platform depends on the load (see Technical Data) and is monitored by
the safety limit switches RK4 and RK5, which are located under the protecting cover
The limit switches must not be adjusted or modified. The inspection and adjustment may only be
carried out by an authorized serviceman.
PRESSURE SPRING
LIMIT SWITCHES RK4 AND RK5
ARTICULATED ARM
LIFTING CYLINDER
Summary of Contents for 240RXT
Page 2: ...DINO 240RXT 2...
Page 3: ...DINO 240RXT 3 ORIGINAL OPERATING INSTRUCTIONS Valid from serial number 24040...
Page 7: ...DINO 240RXT 7 2 REACH DIAGRAM...
Page 8: ...DINO 240RXT 8 3 DIMENSION DRAWING...
Page 18: ...DINO 240RXT 18 S20 S18 S17 S19 S16 Q2 H6 H3 S30 S13 S1 OK2...
Page 36: ...DINO 240RXT 36 Notes...
Page 39: ...DINO 240RXT 39 17 3 LUBRICATION PLAN...
Page 41: ...DINO 240RXT 41 1...
Page 58: ...DINO 240RXT 58 Notes...
Page 60: ...DINO 240RXT 60 18 2 SAMPLE OF INSPECTION PROTOCOL FOR THE ACCESS PLATFORM...
Page 61: ...DINO 240RXT 61...
Page 83: ...DINO 240RXT 83 21 ELECTRIC DIAGRAM 24021...
Page 84: ...DINO 240RXT 84...
Page 85: ...DINO 240RXT 85...
Page 86: ...DINO 240RXT 86...
Page 87: ...DINO 240RXT 87...
Page 88: ...DINO 240RXT 88...
Page 89: ...DINO 240RXT 89...
Page 90: ...DINO 240RXT 90...
Page 91: ...DINO 240RXT 91...
Page 92: ...DINO 240RXT 92...
Page 93: ...DINO 240RXT 93...
Page 94: ...DINO 240RXT 94...
Page 95: ...DINO 240RXT 95...
Page 96: ...DINO 240RXT 96...
Page 97: ...DINO 240RXT 97...
Page 98: ...DINO 240RXT 98...
Page 99: ...DINO 240RXT 99...
Page 100: ...DINO 240RXT 100...
Page 101: ...DINO 240RXT 101...
Page 102: ...DINO 240RXT 102...
Page 103: ...DINO 240RXT 103...
Page 104: ...DINO 240RXT 104...
Page 105: ...DINO 240RXT 105...
Page 106: ...DINO 240RXT 106...
Page 107: ...DINO 240RXT 107 Notes...
Page 110: ...DINO 240RXT 110 24 HYDRAULIC DIAGRAM BOOM OPERATION No 24013...
Page 112: ...DINO 240RXT 112 26 HYDRAULIC DIAGRAM BOOM OPERATION WITH OPTIONAL EQUIPMENT No 24010...
Page 113: ...DINO 240RXT 113 Notes...