65
-
directional valves on the chassis
-
check that the valves of the support outriggers and the driving device
work properly and no movements are executed when the spools are in the
neutral position
-
electro-hydraulic rotary adaptor
-
check the adaptor for tightness
-
check that the lever arm neither seizes nor is loose
-
cylinders
-
lower the outriggers to support position and check the condition of piston
rods and wiper rings
Check the cylinders for external oil leaks.
-
lift the boom to its upper position and check the condition of the piston
rod and the wiper ring of the lift cylinder
-
lift up the articulated arms and check the condition of the piston rods and
wiper rings of the cylinders
-
check the condition of the piston rod and wiper ring of the master
cylinder in the slave cylinder system.
-
lower the boom and check the condition of the piston rod and wiper ring
of the slave cylinder under the platform
-
hoses
-
check the hoses for leaks and chafing
-
pipes
-
check that there are no dents, leaks, trace of corrosion or chafing at the
clamps
Check that the pipes are properly fastened.
-
connections
-
check the hose and pipe connections for leaks
-
inspect thoroughly the electric system
-
check that the control panel boxes are dry, clean and tight.
-
check the condition of the cable connections and their protection against moisture
-
check the condition and attachment of the limit switches
-
check the limit switch lead-throughs for tightness
-
check the connections of the electric valves
-
check the connections of the solenoid valves
-
perform visual inspection of all electric wiring
-
check the condition of the mains cable plug
-
check the attachment points of the hydraulic cylinders
-
check the condition of the bearings and pins of the outrigger cylinders and the locking
of the pins
-
check the condition of the lifting cylinder bearings and pins and the locking of the pins
-
check the condition of the articulated arm cylinder bearings and pins and the locking of
the pins
-
check the condition of the telescope cylinder bearings and pins and the locking of the
pins
Check the condition of the gas springs
-
check the condition of the master and slave cylinder bearings and pins and the locking
of the pins
Summary of Contents for 240RXT
Page 2: ...DINO 240RXT 2...
Page 3: ...DINO 240RXT 3 ORIGINAL OPERATING INSTRUCTIONS Valid from serial number 24040...
Page 7: ...DINO 240RXT 7 2 REACH DIAGRAM...
Page 8: ...DINO 240RXT 8 3 DIMENSION DRAWING...
Page 18: ...DINO 240RXT 18 S20 S18 S17 S19 S16 Q2 H6 H3 S30 S13 S1 OK2...
Page 36: ...DINO 240RXT 36 Notes...
Page 39: ...DINO 240RXT 39 17 3 LUBRICATION PLAN...
Page 41: ...DINO 240RXT 41 1...
Page 58: ...DINO 240RXT 58 Notes...
Page 60: ...DINO 240RXT 60 18 2 SAMPLE OF INSPECTION PROTOCOL FOR THE ACCESS PLATFORM...
Page 61: ...DINO 240RXT 61...
Page 83: ...DINO 240RXT 83 21 ELECTRIC DIAGRAM 24021...
Page 84: ...DINO 240RXT 84...
Page 85: ...DINO 240RXT 85...
Page 86: ...DINO 240RXT 86...
Page 87: ...DINO 240RXT 87...
Page 88: ...DINO 240RXT 88...
Page 89: ...DINO 240RXT 89...
Page 90: ...DINO 240RXT 90...
Page 91: ...DINO 240RXT 91...
Page 92: ...DINO 240RXT 92...
Page 93: ...DINO 240RXT 93...
Page 94: ...DINO 240RXT 94...
Page 95: ...DINO 240RXT 95...
Page 96: ...DINO 240RXT 96...
Page 97: ...DINO 240RXT 97...
Page 98: ...DINO 240RXT 98...
Page 99: ...DINO 240RXT 99...
Page 100: ...DINO 240RXT 100...
Page 101: ...DINO 240RXT 101...
Page 102: ...DINO 240RXT 102...
Page 103: ...DINO 240RXT 103...
Page 104: ...DINO 240RXT 104...
Page 105: ...DINO 240RXT 105...
Page 106: ...DINO 240RXT 106...
Page 107: ...DINO 240RXT 107 Notes...
Page 110: ...DINO 240RXT 110 24 HYDRAULIC DIAGRAM BOOM OPERATION No 24013...
Page 112: ...DINO 240RXT 112 26 HYDRAULIC DIAGRAM BOOM OPERATION WITH OPTIONAL EQUIPMENT No 24010...
Page 113: ...DINO 240RXT 113 Notes...