DINO 240RXT
44
17.7 REGULAR SERVICING
The lift shall be serviced regularly at intervals of 11 - 12 month.
Under demanding conditions where moist, corrosive substances or corrosive climate may speed up the
deterioration of the structure and induce malfunctions, the inspection must be performed more often and
the influence of corrosion and malfunctions must be reduced by using appropriate protective means.
Only technical specialists who are familiar with the structure and the operation of the lift are allowed to
maintain the lift.
We recommend turning to the service staff of the dealer.
SCHEDULE FOR REGULAR SERVICING
1. Clean the lift thoroughly before the service
The hydraulic and electric appliances must not be dismantled if they are not clean. Any contaminants in
the system may cause malfunctions later on. Wash the lift externally.
NOTE!
Be careful not to direct the high pressure water jet straight to the electric appliances, such as the
control panels on the chassis and on the platform, relays, solenoid valves and limit switches.
-
use pressure air to dry the electric devices, hydraulic connectors etc.before opening them
-
apply appropriate moisture repellent to the electric appliances after the drying
-
always protect the piston rods with e.g. CRC3-36 anti-corrosive agent after washing with a
solvent
REMEMBER CLEANLINESS!
2. Change the hydraulic oil and replace the filter
(protect your skin against the hydraulic oil)
-
drain the oil tank through the draining plug opening, with all cylinders in retracted position
-
clean and rinse the oil tank with suitable agent
-
replace the pressure and return filters
-
install the drain plug
-
refill the tank with fresh oil, the oil volume required for change is about 50 l
.
-
Factory filling:
Mobil EAL Hydraulic Oil 32
. Material Safety Sheet: 581017-60
The viscosity class of the hydraulic oil must be
ISO VG 32
and the oil must meet the
requirements according to DIN 51524- HLP.
-
never mix different oil sorts
Summary of Contents for 240RXT
Page 2: ...DINO 240RXT 2...
Page 3: ...DINO 240RXT 3 ORIGINAL OPERATING INSTRUCTIONS Valid from serial number 24040...
Page 7: ...DINO 240RXT 7 2 REACH DIAGRAM...
Page 8: ...DINO 240RXT 8 3 DIMENSION DRAWING...
Page 18: ...DINO 240RXT 18 S20 S18 S17 S19 S16 Q2 H6 H3 S30 S13 S1 OK2...
Page 36: ...DINO 240RXT 36 Notes...
Page 39: ...DINO 240RXT 39 17 3 LUBRICATION PLAN...
Page 41: ...DINO 240RXT 41 1...
Page 58: ...DINO 240RXT 58 Notes...
Page 60: ...DINO 240RXT 60 18 2 SAMPLE OF INSPECTION PROTOCOL FOR THE ACCESS PLATFORM...
Page 61: ...DINO 240RXT 61...
Page 83: ...DINO 240RXT 83 21 ELECTRIC DIAGRAM 24021...
Page 84: ...DINO 240RXT 84...
Page 85: ...DINO 240RXT 85...
Page 86: ...DINO 240RXT 86...
Page 87: ...DINO 240RXT 87...
Page 88: ...DINO 240RXT 88...
Page 89: ...DINO 240RXT 89...
Page 90: ...DINO 240RXT 90...
Page 91: ...DINO 240RXT 91...
Page 92: ...DINO 240RXT 92...
Page 93: ...DINO 240RXT 93...
Page 94: ...DINO 240RXT 94...
Page 95: ...DINO 240RXT 95...
Page 96: ...DINO 240RXT 96...
Page 97: ...DINO 240RXT 97...
Page 98: ...DINO 240RXT 98...
Page 99: ...DINO 240RXT 99...
Page 100: ...DINO 240RXT 100...
Page 101: ...DINO 240RXT 101...
Page 102: ...DINO 240RXT 102...
Page 103: ...DINO 240RXT 103...
Page 104: ...DINO 240RXT 104...
Page 105: ...DINO 240RXT 105...
Page 106: ...DINO 240RXT 106...
Page 107: ...DINO 240RXT 107 Notes...
Page 110: ...DINO 240RXT 110 24 HYDRAULIC DIAGRAM BOOM OPERATION No 24013...
Page 112: ...DINO 240RXT 112 26 HYDRAULIC DIAGRAM BOOM OPERATION WITH OPTIONAL EQUIPMENT No 24010...
Page 113: ...DINO 240RXT 113 Notes...