background image

46

Notes:

Tower

Summary of Contents for dTower

Page 1: ...1 11 Produ t Manual c Tower...

Page 2: ...2...

Page 3: ...sage by disk emulation and passage by pulse Exclusion of energy meter drawing DIP table update Alteration of pulse time 11 March 10 2020 Leandro Dandolini Vin cius Duarte Jorge Grass Layout alteration...

Page 4: ...any language or computer language in any electronic magnetic optical chemical manual way or otherwise without express written permission from Digicon S A Code 069 31 221 Revision 11 English This manu...

Page 5: ...ion between blockages 7 3 Connection of control signs 7 4 dTower operation 7 4 1 Controller board 7 4 2 Functions 7 4 2 1 Configurable functions via input 7 4 2 2 Configurable functions via Ds1 7 4 2...

Page 6: ...understand the processes of installation operations maintenance and unboxing Correct installation and maintenance ensure equipment operation and increase the useful life of its components Correct equ...

Page 7: ...efully read the safety and operation instructions before using this equipment and keep them for future reference Carefully follow instructions and warnings Follow the instructions of operation and use...

Page 8: ...ng the equipment in operation again 2 2 Installation site When selecting the installation site meet the following standards Protective grounding The protective grounding of the building s electrical i...

Page 9: ...rs of this equipment to perform maintenance unless the product manual requires so Leave all maintenance services to qualified technical professionals Humidity Do not allow humidity to enter this equip...

Page 10: ...out previous notice Digicon does not provide any contractual warranty concerning the information in this manual and cannot be held responsible for errors it may contain and problems due to its use The...

Page 11: ...for both directions _ Offers sound signal beep for customizable access control _ Doors with bidirectional movement _ Inputs for activation sensors that open or close the doors _ Optional card collect...

Page 12: ...only in the opposite direction represent passage not cleared LED lights flashing green indicating the direction of passage represent passage cleared B Orientation pictogram front The orientation pict...

Page 13: ...he equipment from its box not to damage it 6 2 Pre installation Before starting installation of the floor where the equipment will be installed dTower must be ready The built in boxes must be installe...

Page 14: ...so to have a small space between them of about 30mm Such space is important to ensure that even closed the door will not injure the user Built in Boxes 4 x4 Conduits with 50 mm diameter Transmitter R...

Page 15: ...s or through chemical anchorage For mechanical bolts minimum floors thickness should be 100mm In case of floors with less than 100mm thickness or special floors use chemical anchorage NOTE To facilita...

Page 16: ...e 5 Attach the threaded bar to the drill and screw it until it reaches the bottom of the hole or until the mark of the threaded bar is leveled with the ground 6 Apply the drill until the chemical mate...

Page 17: ...17 Tower NOTE We recommend using chemical anchorage however if you prefer parabolts make sure the floor is adequate...

Page 18: ...the screw inside the fastener hole 2 place it in the door hole 4 3 With the three parts fitted fix them to the equipment engine 5 4 With the upper part fixed place the screw 3 on the lower part going...

Page 19: ...blue and yellow circles Blue Identify passage for people with special needs PNE with a passage space of 920mm Yellow Identify passage for people with special needs with a passage space of 520mm NOTE U...

Page 20: ...troller board connection terminals AC terminals circuit breaker and power supply Lock for opening upper cover Lock for opening access door Tower WARNING Avoid electric shock Opening or removing the do...

Page 21: ...nterconnection signal cable and DC charge dTower Insert connectors CN4 CN5 and CN6 in their respective places according to printing on interconnection board of dTower T Tower WARNING To reduce the ris...

Page 22: ...identifying where each cable must be connected NOTE Separate the electric network from the logical network NOTE Digicon provides interconnection cables with 3 meters of length The depth of the ducts...

Page 23: ...re below Digicon recommends using the norm NBR 5410 as reference for electrical installations of equipment pieces Power cables of power supply must be connected to the circuit breaker and the ground c...

Page 24: ...ce the risk of electric shock before maintenance turn off the power of the equipment by moving the circuit breaker key to the position OFF Leave all maintenance services to qualified technical profess...

Page 25: ...positive voltage Enabling solid state negative 654321 Vdc Vdc VDC 5 24V Integrator controller Controller board Controller board 54321 Vdc Vdc 5 24V Integrator controller Tower Enab exit Enab entry En...

Page 26: ...in ON d Confirming passage Negative Tower Integrator controller 4321 Negative digital input Controller board Integrator controller Vdc 4321 Positive digital input U U U U U NA NF Rl2 3 4 NA NF 1 2 Rl1...

Page 27: ...ical counter in order to count the passage flow in the direction of entry of the equipment Similarly the output Rl2 can be used to count the passage flow in the direction of exit Confirmation of passa...

Page 28: ...y settings WARNING To reduce the risk of electric shock before maintenance turn off the power of the equipment by moving the circuit breaker key to the position OFF Leave all maintenance services to q...

Page 29: ...asion hitchhiking or withdrawal and will signal it according to its interpretation Switch 1 2 3 4 5 6 7 8 Final time to close door 0 50s ON ON Final time to close door 1 25s OFF ON Final time to close...

Page 30: ...cycle a new passage will not be cleared that is the signal needs to be turned off during 20ms NOTE This feature also depends on the ability of the access management system to support a queue for conse...

Page 31: ...blink indefinitely This mode remains active while the enabling signals for entry and exit are present b Bidirectional clearance In this mode the equipment waits for user interaction to know in which d...

Page 32: ...vents occur Invasion by any side of the blocked area with the door closed Invasion contrary to the direction cleared for passage with the door open Hitchhiker user b NO and NC contact Selection DS1 P2...

Page 33: ...the equipment cleared in a certain direction entry or exit It can also be used as a test to check on the door operation When DS1 P4 is active the door will open for entry and will remain thus until di...

Page 34: ...minimum and maximum times are respectively 0 5 and 10 seconds The SmartSpeed function operates correctly since the passage speed is constant b Validation accumulation Access queue Selection DS2 P3 Wi...

Page 35: ...the clips It allows user passage confirmation through the passage gap To identify this event the equipment generates a small door movement invitation and waits for the user to signal their intention o...

Page 36: ...Measures are provided in millimeters and inches 400 15 748 160 6 299 1 5 0 5 9 0 1 2 5 0 4 9 2 920 520 36 220 20 472 225 8 858 311 12 244 939 36 968 992 39 055 Tower 8 Technical characteristics 8 1 Di...

Page 37: ...VDC 5 A 5 one source per module Frequency 50 60 Hz Average time for opening closing door According to configuration Operating temperature 0 C e 50 C Approx weight 100 kg per packaged module Tower 127...

Page 38: ...nternal dTower R DC powering Check status LED lights of supply to dTower T interconnection board Check CN6 connector of dTower R and T interconnection cable When dTower turns on the breaker immediatel...

Page 39: ...erconnection board and CN1 on engine control board Connections between engine and engine control board Connections between engine and engine control board Mechanical brake of dTower door Connection of...

Page 40: ...off Control or supply cable disconnected Check connection of CN3 on dTower control board Check CN3 and CN8 on dTower R interconnection board Check connection of CN1 on dTower upper pictogram Check 5V...

Page 41: ...ide and upper LED lights activation 1x 6 months Analyze activation of entry and exit pictogram 1x 6 months Analyze activation of buzzer through validations and invalid entries 1x 6 months Check 24V vo...

Page 42: ...of Preventive Maintenance Tower Manufacturer Company Digicon S A Contacts 55 51 3489 7000 www digicon com br Product Model Code Serial number Installation Company Contacts Date Action Date Responsible...

Page 43: ...or organic solvent Be careful never scrape the stainless steel surface with blades spatulas or rough abrasives Rust stains with a cotton swab moistened with water and nitric acid 10 apply topically ma...

Page 44: ...spread this solution with cloth in only one direction the direction of the water flow Do not make circular movements with the cloth Rinse well and repeat the process until the result is satisfactory D...

Page 45: ...for repairs or technical assistance 3 Warranty shall be granted to the buyer only in the face of the bill of sale original or copy 4 Warranty does not apply in the following cases or conditions a defe...

Page 46: ...46 Notes Tower...

Page 47: ...47 Tower...

Page 48: ...ZIP CODE 94045 420 Sales 0xx51 3489 8700 3489 8745 Technical Assistance 0xx51 3489 8903 E mail vendas acesso digicon com br Office S o Paulo Development Technical Assistance Sales Rua S o Paulo 82 Alp...

Reviews: