Changing memory extensions
Press the strip downwards until it engages audibly in place.
Slide the ventilation channel back into its previous position and insert the previously removed cables.
Close the device by mounting the housing cover, sliding it into the front guide and fastening it place with
the knurled screws.
Now insert the power cable into the contactor contact electrical socket of the facility installation and
switch on the device.
01750341829F
19-2
Summary of Contents for BEETLE/M-III
Page 16: ...Before switching on Press this forward so that the cable cover closes flat 01750341829F 6 5...
Page 34: ...Removing the housing cover Lift off the cover upwards Set it aside 01750341829F 12 2...
Page 45: ...Storage Media 01750341829F 13 11...
Page 61: ...Accumulator optional The UPS monitor opens 01750341829F 18 9...