![DH Instruments E-DWT-10000-AF Operation And Maintenance Manual Download Page 31](http://html1.mh-extra.com/html/dh-instruments/e-dwt-10000-af/e-dwt-10000-af_operation-and-maintenance-manual_2492026031.webp)
3. OPERATION
Page 21
© 2008 DH Instruments, a Fluke Company
1. TEST port (DH500F)
2. Reservoir cap vent valve
3. Primping pump
4. Reservoir cap
5. Reference pressure monitor (RPM4-E-DWT)
6. Test shut off valve and fine pressure adjustment
7 ‘Lo Q-RPT shut off’ valve position prompt LED
8. Lo Q-RPT shut off valve
9. ‘Lo Q-RPT active’ valve position prompt LED
10. ‘Lo Q-RPT active’ caution indicator
11. Reservoir shut off valve
12. Variable volume (pressure generation)
13. Variable volume piston position indicator
Figure 9.
E-DWT-10000-AF front view
1. TEST
port
2. System pressure rupture disc
3. Reservoir
4. Reservoir vent valve
5. Priming
pump
6. Test shut off and fine adjustment valve
7. Lo Q-RPT shut off valve
8. Lo Q-RPT pressure relief valve
9. Reservoir shut off valve
10. Variable volume
11. Lo Q-RPT (ref pressure transducer)
12. Hi Q-RPT (ref pressure transducer)
Figure 10.
E-DWT-10000-AF hydraulic schematic