4
Introducti
on
Note
Loading/unloading and installation shall be carried out by at least four persons.
Forcible work with a small number of persons may injure your body. If it falls, it may cause injury.
Note
Hold the projector by the parts shown in the illustration when lifting it.
x 4
Important
Do not have milling area covers, adaptor area covers, tool area covers and dust harvesting hose
attachments.
Installation and Installation
The weight of the main unit alone is 120 kg . Take care when loading/unloading and installing.
Pre-installation check
Summary of Contents for DWX-53DC
Page 3: ......
Page 22: ...Install the aircraft 20 Insta llatio n Relevant informatio n P 41 Connecting Multiple Units ...
Page 59: ...Before starting work 57 Insta llatio n ...
Page 66: ...Spe cific atio ns 64 App endi x Adaptor dimensions for pin materials 62 mm 22 mm 72 mm ...
Page 67: ...Spe cific atio ns 65 App endi x Detection pin dimensions 33 mm 60 mm Φ4 mm ...