![DEPURECO RAM 1000 Instruction And Maintenance Manual Download Page 58](http://html1.mh-extra.com/html/depureco/ram-1000/ram-1000_instruction-and-maintenance-manual_2485228058.webp)
Warning!
Before installing the vacuum, it is important to carry out a thorough
preventive visual inspection to identify any damage occurred during
transport.
In the event that one or more components are damaged, do not continue with installation and inform
DEPURECO about the anomaly and agree upon the actions to be taken.
The vacuum is already equipped with a suction filter to retain the solid elements in the extracted
liquid. - Insert the accessory according to the type of extraction on the opposite side of the hose.
Contact your dealer (or DEPURECO) for information regarding the various types of OPTIONAL that can be
used on this specific model.
- Insert the suction pipe into the inlet port located on the cover and secure the clamp.
The following operation must be carried out by a qualified electrician.
Ensure that the power supply line corresponds to the voltage and frequency indicated on the identification
plate and that it is efficiently earthed.
IT
Tel. 011/98.5
100E8 Volplano
O:
DEPURECO. c
s o E u r o p a .
Fax 011,98.59.326
1
2
=
2
0
IN
HMI
Mod.
Volt
% 1 1
1
Serial N°
kW
Amp
Hz
Y
e
a
Dust class
IP
Kg
The socket to power the vacuum must be protected by a mains disconnect switch in compliance with EC
standards.
Insert the plug (standard supply) into the socket.
Attention!
So not insert the plug into the socket with wet hands.
The use of extensions is not allowed.
If necessary, contact the DEPURECO customer service for further information.
3.3
Installation
21
Summary of Contents for RAM 1000
Page 1: ...R A M2 8 0 R A M2 8 0 MP R A M5 0 0 R A M1 0 0 0 R A MT 5 0 0 R A M1 0 0 0 A V...
Page 36: ......
Page 37: ......
Page 48: ......
Page 52: ...15...
Page 71: ...36 Signed MAINTENANCE LOG INTERVENTION 3 Date Technical Assistance Type of Works Signed...
Page 72: ...3 1 Identification of the main parts 2 3 1 4...
Page 73: ...4 5 6 7 8 9 10 11 12 16 13 15 14...
Page 74: ...5 17 15a...
Page 77: ...8 3 Operation 3 1 Control panel...
Page 113: ...34 INTERVENTION 3 Date Technical Assistance Type of intervention Signature...