![DENT-X 810 Basic Installation, Operation And Maintenance Manual Download Page 29](http://html.mh-extra.com/html/dent-x/810-basic/810-basic_installation-operation-and-maintenance-manual_2483357029.webp)
NOTE:
When the processor is first turned on, the low temperature light flashes until optimal
operating temperature (83 degrees F) is reached. It will then go off.
3.
Set the desired development time by depressing the "TIME" button (Figure 21) accord-
ing to the following chart.
26
Figure 20: On/Off Power Switch
Figure 21: Depressing TIME Button
(810 Basic shown)
NOTE:
Allow 30 to 40 minutes for solution to warm on initial start up.
6 MIN
68 - 83 degrees F (20 - 28C)
Processing during warm-up
4 1/2 MIN
83 degrees F (28C)
Archival processing
ENDO
83 degrees F (28C)
Damp film reading
TIME
TEMPERATURE
APPLICATION
Figure 22: Development Time Chart
V. Operation
The
DENT-X
9000 and 810 Basic processors are designed to produce quality radiographs with
minimal operator effort. Both models automatically control variables such as solution temperature
and transport speed.
OPERATING INSTRUCTIONS
1.
Verify that the water supply valve is open. (If optional water recirculator is used,
verify
that the container is filled with fresh water).
2.
Turn the Main Power Switch ON, located in the back of the rear access cover (Figure
20).