2-½ Element Meters
Configure the Setup Table as follows:
*The CT on channel three of the
ELITE
pro
XC
is placed on the L2 phase and is backwards. Note that the
Ch3 CT is jumpered in parallel into Ch4 of the logger.
**Since the 2 ½ Element method is often used on high voltage metering, a PT ratio other than one is
typical and should be set to whatever the actual PT ratio is.