24
4) Connect the
white wire
on the CT to the
positive terminal
on the measuring device.
5) Connect the
black wire
on the CT to the
negative terminal
on the measuring device.
CT 1 must be placed on the phase listed as V High for Channel 1 in the ELOG setup table. CT2, CT3 and
CT4 must also correspond to the appropriate phase as shown in Channels 2, 3, and 4 in the ELOG setup
table.
D
ID
Y
OU
K
NOW
?
Correct orientation
of a CT is required to ensure
proper measurement. If an arrow
is shown on the CT label, it should
be pointed toward the load.
Otherwise, use the instructions
printed on the CT.
Voltage lead
connections
Current
Transformer
connections
www.
.com
1.800.561.8187
Summary of Contents for ELITEpro XC
Page 58: ...58 Typical Single Phase 2 Wire Setup Diagram www com information itm com 1 800 561 8187 ...
Page 59: ...59 Typical Single Phase 3 Wire Setup Diagram www com information itm com 1 800 561 8187 ...
Page 60: ...60 Typical 3 Phase 3 Wire Delta Setup Diagram www com information itm com 1 800 561 8187 ...
Page 61: ...61 Typical 3 Phase 4 Wire Wye Setup Diagram www com information itm com 1 800 561 8187 ...