Clock Box PRO Installation and Operations Manual V1.1
LAB-110218
3
READ AND SAVE THESE INSTRUCTIONS
WARNING
TO REDUCE THE RISK OF FIRE, ELECTRIC SHOCK, OR INJURY TO PERSON, OBSERVE THE FOLLOWING:
1. Use this unit only in the manner intended by the manufacturer. If you have questions, contact the manufacturer at the
address or telephone number listed on the front cover of this manual.
2. Before servicing or cleaning unit, switch power OFF at service panel and lock the service disconnecting means to
prevent power from being switched on accidentally. When the service disconnecting means cannot be locked, securely
fasten a lockout / tagout device based on local codes.
3. Installation work and electrical wiring must be done by a qualified person in accordance with all applicable codes and
standards, including fire-rated construction codes and standards.
4. When cutting or drilling into wall or ceiling, do not damage electrical wiring and other hidden utilities.
5. To reduce the risk of fire or electric shock, do no use this device other than specified by the manufacturer.
6. Utilize approved wiring only.
7. This unit must be grounded.
DISCLAIMER:
DENLAR Fire Protection shall not be liable for errors
contained in this manual or for incidental, consequential damages in
connection with the furnishing, performance or use of this information.
DENLAR Fire Protection makes no warranty of any kind with regards to
this information, including, but not limited to the implied warranties of
merchantability and fitness for a particular purpose.
G
Summary of Contents for ClockBox Pro
Page 1: ...Clock Box PRO Installation and Operations Manual V1 1...
Page 10: ...Clock Box PRO Installation and Operations Manual V1 1 LAB 110218 10 Device Flow Chart...
Page 27: ...Clock Box PRO Installation and Operations Manual V1 1 LAB 110218 27...
Page 34: ...Clock Box PRO Installation and Operations Manual V1 1 LAB 110218 34 Clock Box PRO Schematic...
Page 35: ...Clock Box PRO Installation and Operations Manual V1 1 LAB 110218 35 Clock Box PRO Datasheet...
Page 36: ...Clock Box PRO Installation and Operations Manual V1 1 LAB 110218 36 Gas Disconnect Datasheet...