Clock Box PRO Installation and Operations Manual V1.1
LAB-110218
16
4
Touch Screen Mounting
Surface Mounting
1.
Using a 5/64
”
Allen wrench (provided in bag inside Clock Box Control Box),
remove the four (4x) allen screws on the front cover of the touch screen.
2.
Underneath the front cover, there is a plate holding the touch screen.
The plate is secured to the touch screen enclosure with two (2x) Phillips
screws. Remove both screws.
a.
Unplug the power cable and ethernet cable from the touch screen.
3.
There are six (6x) slots that a screw can go through to mount the touch
screen enclosure to the wall, secure the touch screen enclosure
(Note: secure to studs or use an anchor).
4.
Attach the ethernet cable and power cable to the touch screen. Secure the
touch screen plate to the touch screen enclosure.
5.
Attach the cover to the touch screen enclosure.
Flush Mounting
1.
Using a 5/64
”
allen wrench (provided in bag inside Clock Box Control Box), remove the four (4x) allen
screws on the front cover of the touch screen.
2.
Underneath the front cover there is a plate holding the touch screen. The plate is secured to the touch
screen enclosure with two (2x) Phillips screws; remove both screws.
a.
Unplug the power cable and ethernet cable from the touch screen.
5
Summary of Contents for ClockBox Pro
Page 1: ...Clock Box PRO Installation and Operations Manual V1 1...
Page 10: ...Clock Box PRO Installation and Operations Manual V1 1 LAB 110218 10 Device Flow Chart...
Page 27: ...Clock Box PRO Installation and Operations Manual V1 1 LAB 110218 27...
Page 34: ...Clock Box PRO Installation and Operations Manual V1 1 LAB 110218 34 Clock Box PRO Schematic...
Page 35: ...Clock Box PRO Installation and Operations Manual V1 1 LAB 110218 35 Clock Box PRO Datasheet...
Page 36: ...Clock Box PRO Installation and Operations Manual V1 1 LAB 110218 36 Gas Disconnect Datasheet...