![Denlar ClockBox Pro Installation And Operation Manual Download Page 4](http://html1.mh-extra.com/html/denlar/clockbox-pro/clockbox-pro_installation-and-operation-manual_2480263004.webp)
Clock Box PRO Installation and Operations Manual V1.1
LAB-110218
4
Clock Box PRO and Hood Interface Diagram
Non-
Plug‘N’Play
1.
120 VAC Input (not provided)
a.
120 VAC / 15 Amp circuit (provided by installer)
2.
Junction Box (not provided)
a.
Run the 120 VAC Input to the Junction Box
b.
Run the 12-2 MC (3) wire, with the red tape, from the Hood to the Junction Box
c.
Run a new cable (4) (not provided) from the Junction Box to the Clock Box PRO Control
Box
d.
Wire nut the Hot leads from the three wires (1, 3, 4) together
e.
Wire nut the Neutral leads from the three wires (1, 3, 4) together
f.
Connect the grounds accordingly (1, 3, 4)
3.
Metal Clad 12-2 MC wire with red tape from the Hood (provided)
4.
Cable to provide 120 VAC from the Main Breaker Panel to the Clock Box PRO (not provided)
1
3
120 VAC Input (not provided)
6
5
4
7
8
10
9
Electrical Disconnect
CB1 / CB2
2
ED1
Summary of Contents for ClockBox Pro
Page 1: ...Clock Box PRO Installation and Operations Manual V1 1...
Page 10: ...Clock Box PRO Installation and Operations Manual V1 1 LAB 110218 10 Device Flow Chart...
Page 27: ...Clock Box PRO Installation and Operations Manual V1 1 LAB 110218 27...
Page 34: ...Clock Box PRO Installation and Operations Manual V1 1 LAB 110218 34 Clock Box PRO Schematic...
Page 35: ...Clock Box PRO Installation and Operations Manual V1 1 LAB 110218 35 Clock Box PRO Datasheet...
Page 36: ...Clock Box PRO Installation and Operations Manual V1 1 LAB 110218 36 Gas Disconnect Datasheet...