Clock Box PRO Installation and Operations Manual V1.1
LAB-110218
18
ENT Flexible Conduit Installation
1.
There are three (3x) 16mm ENT flexible conduits connected to the Clock Box PRO Control Box.
a.
HMI Power/Communication Cable
i.
One (1x) Ethernet Cable
ii.
One (1x) three wire plenum
Cable
b.
Hood Interface cable
i.
One (1x) twelve wire
multiconductor
c.
Input / Output Cable
i.
One (1x) three wire plenum
cable
1.
Input
ii.
One (1x) four wire plenum
cable
1.
Output
2.
The HMI Power/Communication Cable is removed by loosening the gland nut in the Clock Box PRO Control
Box. The Connector on the three wire plenum cable and the ethernet cable are small enough to fit
through the hole in the gland nut. Reverse the process to reinstall the cable.
3.
To remove the Hood Interface Cable and the Input / Output Cable, it requires removing a side cover.
a.
Loosen the two (2x) gland nuts securing the cables to the Clock Box PRO Control Box.
b.
On the outside of the Clock Box PRO Control Box, there are two (2x) Phillips screws securing the
side cover to the box. Remove the two screws, take the side cover off.
c.
With the side cover removed, it opens and opening in the box that is wide enough to allow the
cables connectors to be removed from the Clock Box PRO Control Box. These plugs remain
attached to the cables. To install the cables, reverse the process.
Summary of Contents for ClockBox Pro
Page 1: ...Clock Box PRO Installation and Operations Manual V1 1...
Page 10: ...Clock Box PRO Installation and Operations Manual V1 1 LAB 110218 10 Device Flow Chart...
Page 27: ...Clock Box PRO Installation and Operations Manual V1 1 LAB 110218 27...
Page 34: ...Clock Box PRO Installation and Operations Manual V1 1 LAB 110218 34 Clock Box PRO Schematic...
Page 35: ...Clock Box PRO Installation and Operations Manual V1 1 LAB 110218 35 Clock Box PRO Datasheet...
Page 36: ...Clock Box PRO Installation and Operations Manual V1 1 LAB 110218 36 Gas Disconnect Datasheet...