Operating the PV inverter
Grid (as shown
on the Display)
Description
10 TL 15 TL 20 TL 30 TL
Australia
Australia AS 4777
x
x
Belgium
Belgium as per C10/11, June 2012
x
x
Bulgaria
Bulgaria as per VDE 0126
x
x
Czech
Czech Republic as per VDE 0126
x
x
Denmark
Denmark as per VDE AR N 4105
x
x
France
France as per UTE 15 712-1
x
x
France (60Hz)
French Islands 60 Hz
x
x
Germany (VDE0126)
Germany as per VDE 0126
x
x
x
Germany (LVD)
Germany as per VDE AR N 4105
x
x
x
x
Germany (MVD)
Germany as per BDEW
x
x
Greece
Greece as per VDE 0126
x
x
Italy BT CEI 0-21
Italy as per CEI 0-21:2012-06 for PV Installations smaller or
equal to 6 kW
x
x
x
Italy MT A70
Italy as per CEI 0-21:2012-06 for PV Installations larger
than 6 kW
x
x
x
Netherlands
Netherlands as per VDE 0126 + EN 50438
x
x
Portugal
Portugal as per EN 50438
x
x
Romania
Romania as per VDE 0126
x
x
Slovakia
Slovakia as per VDE 0126
x
x
Slovenia
Slovenia as per SONDO Class C
x
x
x
Spain (RD661)
Spain as per RD 661
x
x
Spain (RD1663)
Spain as per RD 1663
x
x
Spain (RD1699)
Spain as per RD 1699
x
x
UK
United Kingdom G59-2 230 V
x
x
UK (240)
United Kingdom G59-2 240 V
x
x
Figure 7.1.: Country Settings on initial startup
–