5.5 Battery connector
The BAT compatible wiring gauge is 4mm^2 - 6mm^2, should have an ampacity
based on AS/NZS 4777.1, it is recommended to use 90°C(194°F)
Connection PV cables according to following:
1. Route the BAT wires through the conduit, and strip the wire end to 12mm.
2. Use 5mm (3/16 inch) flat blade screw driver to push the spring of each terminal.
3. Connect the positive wires to BAT+ terminals and connect the negative wires to
BAT- terminals.
- Note: Verify the connection before power up the inverter.
push
Figure 5-6 : BAT cable connection
Installation of the BAT Cable Gland
1
.
Loosen the front cover
①
counterclockwise.
2
.
Remove the rubber washer
②
from the fastening ring
③
.
3
.
Connect the cable with the terminal.
4. Install the rubber washer
②
to the fastening ring
③
.
5. Surely tighten the front cover
①
.
①
②
③
* Cable range: 4.5 - 6 mm
M25
Wiring
21