Installation
Installation Manual
23
13. Locate the eye bolts on each corner of the 100kW PCS.
14. Check the eye bolts are properly tightened to frame.
Figure 21.
Eye Bolts Locations
Follow the initial start-up procedures for the hoist as described in the manufacturer's operation manual.
Do not attempt operation until all start-up procedures have been fulfilled.
The load attachment may differ from the following figure depending on the type of chain hoist used. The
following is a depicting to illustrate a possible scenario.
CAUTION!
T
HE
UNIT
WEIGHS
APPROXIMATELY
310
KG
/ 683
LBS
. T
O
PREVENT
POSSIBLE
DAMAGE
OR
INJURY
ANY
LIFTING
DEVICE
MUST
BE
RATED
TO
WITHSTAND
THE
MAXIMUM
REQUIRED
WEIGHT
.
CAUTION!
T
HE
UNIT
SHOULD
NOT
BE
INSTALLED
WITH
THE
CABINET
DOORS
OPEN
.
WARNING!
Before proceeding with the normal operation of the hoist, the operator (s) must be trained
accordance with the hoist manufacturer's operation manual. Failure to read and comply with
any of the instructions and limitations noted in this manual and the hoist manufacturer's
manual can result in product failure, serious bodily injury or death, and/or property damage.
WARNING!
Keep hoist lines plumb. The working load limits of hoisting equipment apply only to freely
suspended loads on plumb hoist lines. If the hoist line is not plumb during load handling, side
loads are created which can destabilize the load and cause structural failure or tip-over, with
little warning.
!
!
ON
OFF
STANDB
Y
RUN
FAULT
ON
AC DISC
ONNE
CT
OFF
ON
DC DISC
ONNE
CT
OFF
Eye Bolts for
Positioning with Hoist
!
!