
Installation
Installation Manual
17
Chain Hoist Installation
1. Unpack the 100kW PCS, see “Unpacking the Unit” on page 12.
2. Remove the hexagonal nuts and washers securing the 100kW PCS to the shipping pallet.
Figure 12.
Detaching PCS from a Pallet
CAUTION!
T
O
MOVE
THE
100
K
W PCS,
USE
LIFTING
EQUIPMENT
THAT
HAS
APPROPRIATELY
RATED
LIFT
CAPACITY
.
CAUTION!
I
F
USING
LIFTING
LUGS
,
BE
SURE
THE
SPREADER
BAR
IS
SUFFICIENTLY
LONG
TO
PREVENT
DAMAGE
TO
THE
HOOD
AND
BE
SURE
TO
USE
A
MINIMUM
OF
FOUR
STRAPS
OF
SUFFICIENT
LENGTH
.
CAUTION!
M
AKE
SURE
THE
SWITCH
IS
OFF
(
POWERED
OFF
)
BEFORE
OPENING
THE
FRONT
PANEL
.
!
!
ON
OFF
STANDB
Y
RUN
FAULT
ON
AC DI
SCONN
ECT
OFF
ON
DC DI
SCONNE
CT
OFF
!