Installing the Dell PowerVault 56F 16-Port Fibre Channel Switch
1-1
This chapter discusses the following aspects of installing the Dell PowerVault 56F
16-Port Fibre Channel switch:
Unpacking the switch
Power requirements
Site location
Installing a GBIC module with power on
Fibre channel cable connections
Front panel controls
Ethernet connections
Verifying power-on self-test (POST)
( )*+,-)
NOTE: Some items may be shipped as part of an over-pack.
While unpacking the switch, check to make sure the following items are included:
PowerVault 56F switch unit
Power cord
Five copper gigabit interface converter (GBIC) modules or four optical and one
copper GBIC modules, depending on the switch configuration
User’s Guide
, this
Installation and Troubleshooting Guide
, and the
Switch Man-
ager Guide
(if ordered)
Installation kit, which includes rubber mounting feet
Save packing materials in case you need to return the switch.
Summary of Contents for PowerVault 50F
Page 1: ... ...
Page 12: ...xiv ...
Page 16: ...xviii ...
Page 30: ...1 6 Installation and Troubleshooting Guide ...
Page 108: ...5 10 Installation and Troubleshooting Guide ...
Page 116: ...6 8 Installation and Troubleshooting Guide ...
Page 136: ...7 20 Installation and Troubleshooting Guide ...
Page 160: ...A 24 Installation and Troubleshooting Guide ...