3.
If installed, remove the PSU blank.
Steps
Slide the new PSU into the chassis until the PSU is fully seated and the release latch snaps into place.
Next steps
1.
If you have unlatched the cable management arm, relatch it. For information about the cable
management arm, see the rack documentation of the system.
2.
Connect the power cable to the PSU and plug the cable into a power outlet.
CAUTION: When connecting the power cable, secure the cable with the strap.
NOTE: When installing, hot-swapping, or hot-adding a new PSU in a system with two PSUs,
allow several seconds for the system to recognize the PSU and determine its status. The PSU
status indicator turns green to signify that the PSU is functioning properly.
Related Tasks
Removing the power supply unit blank
Removing the power supply unit blank
Prerequisites
Ensure that you follow the
Safety instructions
.
Steps
If you are installing a second power supply unit (PSU), remove the PSU blank in the bay by pulling the
blank outward.
CAUTION: To ensure proper system cooling, the PSU blank must be installed in the second
PSU bay in a non-redundant configuration. Remove the PSU blank only if you are installing a
second PSU.
107