Cabinet stack up for a minimum configuration............................................................ 21
Cabinet stack up for a maximum configuration........................................................... 23
Cabinet stack up for a minimum configuration............................................................25
Cabinet stack up for a maximum configuration........................................................... 27
Cabinet stack up for a minimum configuration............................................................29
Cabinet stack up for a maximum configuration............................................................31
A10 sliding rail assembly - 1U systems.........................................................................32
B13 sliding rail assembly - 2U systems........................................................................ 32
Installing the rear end of the rail................................................................................. 33
Installing the front end of the rail................................................................................34
Installing screws......................................................................................................... 35
Pull the inner rails out of the cabinet.......................................................................... 35
Install the system in the rails...................................................................................... 36
Slide the system into the cabinet................................................................................37
Installing the front bezel on 1U system....................................................................... 38
Installing the front bezel on 2U system'......................................................................38
CMA bracket slots...................................................................................................... 39
AC Connectors on rear panel of servers and switches................................................ 42
Single-phase power distribution................................................................................. 44
Console and management ports on switches..............................................................50
Management A, nodes 1 - 16 cabling example..............................................................51
Data networks A and B cabling example..................................................................... 56
Cabinet stack up for 2U1N configurations.................................................................. 65
A10 sliding rail assembly - 1U systems.........................................................................66
B13 sliding rail assembly - 2U systems........................................................................ 67
Installing the rear end of the rail................................................................................. 68
Installing the front end of the rail................................................................................68
Installing screws......................................................................................................... 69
Pull the inner rails out of the cabinet.......................................................................... 70
Install the system in the rails.......................................................................................70
Slide the system into the cabinet................................................................................ 71
Installing the front bezel on 1U system....................................................................... 72
Installing the front bezel on 2U system'...................................................................... 72
CMA bracket slots...................................................................................................... 73
Power connectors on rear panel of servers and switches........................................... 76
Single-phase power distribution..................................................................................78
Management network ................................................................................................80
Data networks A and B............................................................................................... 83
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
FIGURES
Hardware Installation Guide
5
Summary of Contents for EMC VxFlex Ready Node 14G
Page 1: ...Dell EMC VxFlex Ready Node 14G Hardware Installation Guide 302 004 321 REV 03 ...
Page 6: ...FIGURES 6 Hardware Installation Guide ...
Page 8: ...TABLES 8 Hardware Installation Guide ...
Page 16: ...Before You Begin 16 Hardware Installation Guide ...
Page 18: ...1U1N Procedures 18 Hardware Installation Guide ...
Page 40: ...1U1N Configuration Equipment Installation 40 Hardware Installation Guide ...
Page 48: ...Install AC Power Cables 48 Hardware Installation Guide ...
Page 62: ...2U1N Procedures 62 Hardware Installation Guide ...
Page 74: ...2U1N Configuration Equipment Installation 74 Hardware Installation Guide ...