Management network A, nodes 1 - 16 cabling
Use the following figure and table to connect cables for management network A,
nodes 1 - 16.
Figure 21 Management A, nodes 1 - 16 cabling example
Node 16
Node 1
Mgmt Switch A
To core switch or
Mgmt Switch B
Mgmt Server
Data Switch A
Data Switch B
BMC/
iDRAC
2
4
MGMT1
NIC1
38
45
46
<…>
47
MGMT
48
Table 10 Management A, nodes 1 -16 cabling
Source
Destination
Node 1 BMC (iDRAC)
Management SwitchA Port 2
Node 1 MGMT1
Management SwitchA Port 4
Node 2 BMC (iDRAC)
Management SwitchA Port 6
Node 2 MGMT1
Management SwitchA Port 8
Node 3 BMC (iDRAC)
Management SwitchA Port 10
Node 3 MGMT1
Management SwitchA Port 12
Node 4 BMC (iDRAC)
Management SwitchA Port 14
Install Management Network I/O Cables
Management network A, nodes 1 - 16 cabling
51
Summary of Contents for EMC VxFlex Ready Node 14G
Page 1: ...Dell EMC VxFlex Ready Node 14G Hardware Installation Guide 302 004 321 REV 03 ...
Page 6: ...FIGURES 6 Hardware Installation Guide ...
Page 8: ...TABLES 8 Hardware Installation Guide ...
Page 16: ...Before You Begin 16 Hardware Installation Guide ...
Page 18: ...1U1N Procedures 18 Hardware Installation Guide ...
Page 40: ...1U1N Configuration Equipment Installation 40 Hardware Installation Guide ...
Page 48: ...Install AC Power Cables 48 Hardware Installation Guide ...
Page 62: ...2U1N Procedures 62 Hardware Installation Guide ...
Page 74: ...2U1N Configuration Equipment Installation 74 Hardware Installation Guide ...