Figure 10 Installing the front end of the rail
6. Repeat the preceding steps to install the right rail assembly.
Secure the rail assemblies to the cabinet
The supplied screws and washers are used to secure the rail assemblies to the front
and rear of the cabinet.
Note
For square hole cabinets, install the supplied conical washer before installing the
screw. For unthreaded round hole cabinets, install only the screw without the conical
washer.
Procedure
1. Align the screws with the designated U spaces on the front and rear rack
flanges.
Ensure that the screw holes on the tab of the system retention bracket are
seated on the designated U spaces.
2. Insert and tighten the two screws using the Phillips #2 screwdriver.
1U1N Configuration Equipment Installation
34
Hardware Installation Guide
Summary of Contents for EMC VxFlex Ready Node 14G
Page 1: ...Dell EMC VxFlex Ready Node 14G Hardware Installation Guide 302 004 321 REV 03 ...
Page 6: ...FIGURES 6 Hardware Installation Guide ...
Page 8: ...TABLES 8 Hardware Installation Guide ...
Page 16: ...Before You Begin 16 Hardware Installation Guide ...
Page 18: ...1U1N Procedures 18 Hardware Installation Guide ...
Page 40: ...1U1N Configuration Equipment Installation 40 Hardware Installation Guide ...
Page 48: ...Install AC Power Cables 48 Hardware Installation Guide ...
Page 62: ...2U1N Procedures 62 Hardware Installation Guide ...
Page 74: ...2U1N Configuration Equipment Installation 74 Hardware Installation Guide ...