Table 17 Single-phase power distribution cabling (continued)
Source
Destination
Node 2 PSU2
PDU 4 Port 13
Node 1 PSU1
PDU 3 Port 14
Node 1 PSU2
PDU 4 Port 14
Management network wiring for 2U1N configuration
Use the following figure and table to connect the management network cables.
Note
The page does not provide enough space to illustrate cabling of the maximum number
of nodes in the management network. However, the table does provide all the source
to destination cabling for the maximum sized network.
Figure 37 Management network
iDRA
C
iDRA
C
Node 16
Node 1
Mgmt Switch A
To core switch or
Mgmt Switch B
Mgmt Server
Data Switch A
Data Switch B
<…>
MGMT
38
45
46
47
48
NIC1
2
4
NIC1
BMC/
iDRAC
Wiring Diagrams for a 2U1N Configuration
80
Hardware Installation Guide
Summary of Contents for EMC VxFlex Ready Node 14G
Page 1: ...Dell EMC VxFlex Ready Node 14G Hardware Installation Guide 302 004 321 REV 03 ...
Page 6: ...FIGURES 6 Hardware Installation Guide ...
Page 8: ...TABLES 8 Hardware Installation Guide ...
Page 16: ...Before You Begin 16 Hardware Installation Guide ...
Page 18: ...1U1N Procedures 18 Hardware Installation Guide ...
Page 40: ...1U1N Configuration Equipment Installation 40 Hardware Installation Guide ...
Page 48: ...Install AC Power Cables 48 Hardware Installation Guide ...
Page 62: ...2U1N Procedures 62 Hardware Installation Guide ...
Page 74: ...2U1N Configuration Equipment Installation 74 Hardware Installation Guide ...