3
Click
Finish
.
The server template is associated with the VLAN network.
Deploy the server template
Prerequisite
Before deploying the server template, you must associate the server template with a VLAN.
About this task
To deploy the server template, perform the following steps:
Steps
1
In the
Deploy
pane, select the
MX740c with Intel mezzanine
server template, and then click
Deploy Template
.
2
In the
Deploy Template
window, complete the following steps:
a Click
Select
to choose the slots or compute sleds to deploy the template to.
b Select
Do not forcefully reboot the host OS
.
c Click
Next
.
d Select
Run Now
.
e Click
Finish
.
The interfaces on the switches are updated automatically. SmartFabric configures each interface with an untagged VLAN and tagged
VLANs.
SmartFabric network configuration
61
Summary of Contents for PowerEdge MX7000
Page 1: ...Dell EMC VMware Cloud Foundation for PowerEdge MX7000 Deployment Guide ...
Page 8: ...Figure 1 Cloud Foundation deployment workflow 8 Overview ...
Page 27: ...Figure 19 Dual PowerEdge MX7000 enclosure configuration Physical layout 27 ...
Page 29: ...Figure 20 MX9002m Management module cabling Physical layout 29 ...
Page 30: ...Figure 21 Connectivity between FSE modules and FEM modules 30 Physical layout ...
Page 31: ...Figure 22 Uplinks to customer network environment Physical layout 31 ...
Page 42: ...Figure 25 MX9002m Management Module cabling 42 Networking requirements ...
Page 43: ...Figure 26 Connectivity between FSE modules and FEM modules Networking requirements 43 ...
Page 44: ...Figure 27 Uplinks to customer network environment 44 Networking requirements ...