Figure 41. Installing the Network Daughter Card
Next steps
1
2
Follow the procedure listed in
After working inside your system
.
Mezzanine card
Mezzanine card installation guidelines
Your system supports two mezzanine cards:
•
mezzanine card slot C supports Fabric C. This card must match the fabric type of I/O modules installed in I/O module bays C1 and C2.
•
mezzanine card slot B supports Fabric B. This card must match the fabric type of I/O modules installed in I/O module bays B1 and B2.
Removing the mezzanine card
Prerequisites
1
Follow the safety guidelines listed in
2
Follow the procedure listed in
Before working inside your system
.
Steps
1
Open the retention latch by pressing the ridged area on the retention latch, and lifting the latch up.
84
Installing and removing system components