Figure 26 Securing the front of the enclosure
CL4725
Transferring components from the faulted DAE to the
replacement DAE
Use the procedures in this section to transfer each power/cooling module, link control cards
(LCCs), disk, and disk filler module from the faulted DAE to the corresponding locations in the
replacement DAE.
To help ensure the correct placement in the enclosure:
l
Transfer one component at a time.
l
When transferring a power/cooling module or LCC:
Always move a component from position A (faulted) to position A (replacement), or B to B; do
not move A to B or B to A.
n
Move components from position A of the faulted DAE to position A of the replacement
DAE.
n
Move components from position B of the faulted DAE to position B of the replacement
DAE.
l
Transfer each disk and disk filler module to the SAME SLOT LOCATION that it occupied in
faulted DAE.
Removing a power/cooling module
Procedure
1. Press the orange handle button to release the module.
2. Pull the latch outward and remove the power/cooling module from its slot.
Replacing a 25-Slot Disk-Array Enclosure
38
Dell EMC FS25 SSD Shelf Guide Field Replacement Unit Guide
Summary of Contents for FS25
Page 1: ...Dell EMC FS25 SSD Shelf Guide Version 7 0 Field Replacement Unit Guide Rev 01 September 2019 ...
Page 6: ...Figures 6 Dell EMC FS25 SSD Shelf Guide Field Replacement Unit Guide ...
Page 8: ...Tables 8 Dell EMC FS25 SSD Shelf Guide Field Replacement Unit Guide ...
Page 12: ...Revision history 12 Dell EMC FS25 SSD Shelf Guide Field Replacement Unit Guide ...
Page 30: ...FRU Removal and Replacement 30 Dell EMC FS25 SSD Shelf Guide Field Replacement Unit Guide ...