![Del Medical DynaRad Phantom-8000 Installation, Operation & Service Manual Download Page 46](http://html1.mh-extra.com/html/del-medical/dynarad-phantom-8000/dynarad-phantom-8000_installation-operation-and-service-manual_2465594046.webp)
Phantom Installation, Operation & Service Manual
3-4 Controls
3.3.2 Miscellaneous Controls
Figure 3-2 below shows the miscellaneous controls of the Phantom X-ray
system. The paragraphs that follow describe each control.
Figure 3-2. Miscellaneous Controls
1
Prep/ Exposure
- This two-position switch controls x-ray output. The
first position is for prep. This causes the READY light on the main
control panel to go out and then come on again to indicate the unit is
ready for exposure. The button is then pressed and held all the way
down to start an exposure as indicated by the X-RAY indicator on the
main control panel lighting up. If you press and release the button
before the READY light comes on, the process will be stopped and the
FAULT light will come on. The unit can be reset by pressing the
RESET button on the main control panel.
2
Control Handles -
These handles are used to maneuver the unit into
position over the patient.
3
Cassette Holder
- This compartment is used to hold film cassettes.
The compartment has a spring-loaded brace that holds the cassettes
firmly in place to keep them from rattling when the unit is moved.
4
Wheel Brakes
- These brakes lock the rear wheels in place after the
unit has been positioned over the patient.
1
3
4
6
7
8
9
X-Ray Head
2
5
Tube Arm
Locking Cylinder
Front Leg
Assembly
Summary of Contents for DynaRad Phantom-8000
Page 6: ...Phantom Installation Operation and Service Manual 4...
Page 24: ...Phantom Installation Operation Service Manual i 18 Applicable Standards...
Page 26: ...Phantom Installation Operation Service Manual ii 2...
Page 66: ...Phantom Installation Operation Service Manual 3 24 Folding Phantom...
Page 74: ...Phantom Installation Operation Service Manual 4 8 Check tube head rotation friction lock...
Page 106: ...Phantom Installation Operation Service Manual 6 22 Release Cable Replacement...
Page 116: ...Phantom Installation Operation Service Manual 8 2 Electrical Schematics...
Page 117: ......
Page 118: ......
Page 119: ......
Page 120: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ......
Page 125: ......
Page 126: ......
Page 127: ......
Page 147: ...Phantom Installation Operation Service Manual 9 20 Control Chassis Assembly 501203...
Page 148: ...Phantom Installation Operation Service Manual n 1 Notes...
Page 149: ...Phantom Installation Operation Service Manual n 2 Notes...
Page 150: ...Phantom Installation Operation Service Manual n 3 Notes...
Page 151: ...Phantom Installation Operation Service Manual n 4 Notes...