Phantom Installation, Operation & Service Manual
2-6 Assembly Instructions
14
Tilt X-ray assembly (1 in Figure 2-9) down.
Figure 2-9. X-Ray Head Assembly
15
Align four pins (1 in Figure 2-10)on control console with holes (2) on
frame. Then tap console into place with the ball of your hand as
shown in Figure 2-11.
Figure 2-10. Control Console Alignment
1
1
2
Summary of Contents for DynaRad Phantom-8000
Page 6: ...Phantom Installation Operation and Service Manual 4...
Page 24: ...Phantom Installation Operation Service Manual i 18 Applicable Standards...
Page 26: ...Phantom Installation Operation Service Manual ii 2...
Page 66: ...Phantom Installation Operation Service Manual 3 24 Folding Phantom...
Page 74: ...Phantom Installation Operation Service Manual 4 8 Check tube head rotation friction lock...
Page 106: ...Phantom Installation Operation Service Manual 6 22 Release Cable Replacement...
Page 116: ...Phantom Installation Operation Service Manual 8 2 Electrical Schematics...
Page 117: ......
Page 118: ......
Page 119: ......
Page 120: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ......
Page 125: ......
Page 126: ......
Page 127: ......
Page 147: ...Phantom Installation Operation Service Manual 9 20 Control Chassis Assembly 501203...
Page 148: ...Phantom Installation Operation Service Manual n 1 Notes...
Page 149: ...Phantom Installation Operation Service Manual n 2 Notes...
Page 150: ...Phantom Installation Operation Service Manual n 3 Notes...
Page 151: ...Phantom Installation Operation Service Manual n 4 Notes...