![dehn HVI Conductor Installation Instructions Manual Download Page 26](http://html.mh-extra.com/html/dehn/hvi-conductor/hvi-conductor_installation-instructions-manual_2465044026.webp)
8
Publication No. 1637/ UPDATE
07
.1
9
Mat-No. 3003103
35 mm
15 mm
Ø
10 mm
Ø
10 mm
4. Installation of the supporting tube system
The air-termination masts must be positioned adjacent to the structure to be protected or scattered over
the roof surface so that, starting from the metal air-termination tip, a protected volume is created for the
object to be protected or the entire roof surface and for the
HVI
light Conductor
.
4.1 Models
According to the requirements on the local conditions, various air-termination masts with different diameters
are available (see Fig. 3.1 and 3.2, page 9 and 10 as well as Table 2, page 16).
4.1.1 Fixing at the air-termination mast 30/50
Position the connecting plate above the top end of the supporting tube and tighten it with the two lock
nuts (2x
M8
self-locking nuts with serrated bearing) using a tightening torque of
15 Nm
.
After assembling the conductors by means of the connection elements (according to chapter 3., page 7),
mount the four
HVI
light Conductors
to the connecting plate by means of the
M12
nut and the spring
washer according to Fig. 3.1, page 9 and Fig. 3.2, page 10 using a tightening torque of
25 Nm
.
Mount the fixing ring to the supporting tube as shown Fig. 3.1, page 9 and Fig. 3.2, page 10. Tighten the
fixing ring to the supporting tube via the lock screw (
M8
hexagon screw) using a tightening torque of
15 Nm
.
Fig. 2
Contacting the conductor end
dark grey outer sheath
tightening torque of 5 Nm
heat-shrinkable sleeve
black sheath
threaded pins
spring washer
M12 nut
spring washer
M12 nut