DT9502
48
20171205-V3
7.11. Tests
(09. menu item)
Function
Checking
the
display
and the limit outputs.
Sequence of operations
1. Enter the menu by typing either the user code or the
supervisor code.
The way the code should be type in is described in Chapter
7.1. Typing the code in.
You see this:
.
2. Keep stepping by pressing
▲
button as long as you see
this menu item:
.
3. Enter the menu item by pressing the
ENTER
button.
4. You see this
on the display. (It’s meaning:
Display test). The mnemonic
is blinking.
5. If you want to test the display, press the
ENTER
button.
In this case all the segments on the display get switched on.
By pressing the
▲
button several times you can select from
several test patterns by which you can decide whether the
display is good or not. You may exit from the display test by
pressing the
MENU
button. You see this
again.
6. If you want to test the limit outputs, press the
▲
button to
switch to the
mnemonic from the
mnemonic. (It’s meaning: Output test).
7. Press the
ENTER
button.
8. You see this:
. The blinking sign after 1 indicates
the status of the first limit output, the blinking sign after 2
indicates the status of the second limit output. In this
present case both of them are switched off. This is why the
blinking sign is in the lower position.
9. Pressing the
▲
button, you can switch the outputs on.
•
= both are switched OFF.
•
= 1. ON; 2. OFF.
•
= 1. OFF; 2. ON.
•
= both are switched ON.
Summary of Contents for DT9502
Page 1: ...DT9502 Intrinsically Safe Temperature Meter Transmitter Operating Instructions ...
Page 64: ...DT9502 64 20171205 V3 10 2 Application example ...
Page 84: ...DT9502 84 20171205 V3 10 9 ATEX Certification ...
Page 85: ...DT9502 20171205 V3 85 ...
Page 86: ...DT9502 86 20171205 V3 ...
Page 87: ...DT9502 20171205 V3 87 ...
Page 88: ...DT9502 88 20171205 V3 ...
Page 89: ...DT9502 20171205 V3 89 ...
Page 90: ...DT9502 90 20171205 V3 ...
Page 91: ...DT9502 20171205 V3 91 ...
Page 92: ......