P
I
02 9604 1226 E
I
|
danielaappliances.com.au
PA G E 1 3
INSTALLATION – ELECTRICAL CONNECTION
BEFORE CONNECTING THE PLUG INTO THE POWER SOCKET, FOLLOW THESE INSTRUCTIONS:
•
The electrical supply for the upright cooker must be a 240Volt 50 Hz.
•
The fuse and electrical wiring of the home / premises must support the load of the
appliance.
•
The 3-pin plug, used to connect the electricity, must be easily reached when the hotplate is
in its installed position.
•
The hotplate must be earthed. Connect the hotplate to a properly earthed and rated power
socket, as appropriate.
•
The flexible cord of the appliance must not be subject to direct heat and must be positioned
after installation of the hotplate so that its temperature does not exceed 75ºC.
IMPORTANT:
If a power socket needs to be installed or relocated, the work must be
carried out by a licensed electrician.
INSTALLATION –
GAS CHECKS AND BURNER ADJUSTMENTS
IMPORTANT:
Set appliance operating pressure, to that indicated on appliance data plate.
The test point is located on the appliance regulator (or adaptor for LPG).
PRESSURE ADJUSTMENT
•
•
Remove the sealing screw from the regulators test point at the rear of the appliance and
place the hose of the Manometer onto it. Turn the gas on to the appliance and light the
Wok Burner and Small Burner at maximum setting. Check the pressure and adjust at the
regulator if necessary to the settings in the table on the last page or on the Data plate.
•
For Propane Gas, adjust at the regulator on the gas supply cylinder – Turn regulator
adjusting screw clockwise increase pressure whilst anti-clockwise decrease pressure.
Refit the test point sealing screw when finished. Check installation for correct operation.