![background image](http://html1.mh-extra.com/html/danfoss/vacon-100-industrial/vacon-100-industrial_installation-manual_4102935063.webp)
APPENDIX 3 - EXAMPLE WITH SIEMENS PLC
vacon • 61
Local contacts: http://drives.danfoss.com/danfoss-drives/local-contacts/
9
17. Change the IO cycle to 4 ms (minimum) or greater.
Next step is to download the program into PLC. After this, the PLC starts communication with the
VACON
®
100 AC drive. Please note that controlling of AC drive requires a PLC programming block
which contains the controlling logic.
11710_uk
Summary of Contents for VACON 100 industrial
Page 2: ......