![Danfoss EM-PMI375 User Manual Download Page 81](http://html1.mh-extra.com/html/danfoss/em-pmi375/em-pmi375_user-manual_3432254081.webp)
Electric machine yearly maintenance checklist (continued)
Acceptance
N.A
PASS
FAIL
Coolant flow direction changed and connection checked
☐
☐
☐
Coolant quality as specified
☐
☐
☐
Used coolant:
Functioning of the cooling system in general
☐
☐
☐
Tightness of the tubing and connections (no leakages)
☐
☐
☐
Cleanliness of the ventilation plug
☐
☐
☐
Grounding
Power cable shield connection resistances to ground
(electric machine enclosure) checked
☐
☐
☐
Low voltage cable shield grounding resistances checked
☐
☐
☐
Connection to grounding points checked
☐
☐
☐
Notes:
•
•
•
•
•
•
•
•
•
•
•
•
•
Do not try to tighten bolts or screws that are not discussed in the product manual and that are not
needed for the normal installation procedures. Sealing of the screws may break.
For cleaning instructions, refer to Chapter
Used service parts
Part description
Part type
Quantity
Item (order) number
_
_
_
_
User Guide
EM-PMI375
Storage, installation and maintenance checklists
©
Danfoss | November 2021
BC265856307805en-000202 | 81