8.1 pic.
8.2 pic.
6.2 pic.
6.3 pic.
If greenhouse length is 8 m – post reinforcement rails must be connected like this: 4 m (NO.
5) + 4 m (NO. 5).
If greenhouse length is 10 m – post reinforcement rails must be connected like this: 4 m (NO.
5) + 4 m (NO. 5) + 2 m (NO. 6).
7 pic.
12 (26) and nuts M5 (29) (8.1 – 8.2 pic)
NR.2 and NR.3 connection
9. Separately assemble top posts (NO. 1) with top post connections (plates with 4 holes) (14)
by using screws M5-12 (26) and nuts M5 (29) and attach ridge reinforcement at appropriate
points (NO. 8) by using bolts M5-12 (26) and nuts M5 (29) (9.1 - 9.2 pic).
Inside
Attaching posts to foundation at side
corners
Attaching posts to foundation at the
middle of sides
7
Outside
7. Side-bottom posts (NR. 3) are tightened by
installing post reinforcement rails (NR. 5)
using screws M5-12 (26) and nuts M5 (29)
(example 7). Same actions must be carried
out on both sides (7 pic).
With larger than 10 m2 greenhouse TITAN
Dome, additional rails must be used for
reinforcement of post.
If greenhouse length is 6 m
-
post
reinforcement rails must be connected like
this: 4 m (NO. 5) + 2 m (NO. 6).