10
14. Tighten door post and end post (NO. 9) to door post and end post holders (NO. 10). Top
part of post must be tightened to door post and end post holders (NO. 10) and bottom part
directly to front end part of foundation (17) using screws M5-12 (26) and nuts M5 (29). Same
actions must be used at the front end and at the back end (14.1 – 14.2 pic).
14.1 pic.
14.2 pic.
15. Tighten the door and back end reinforcements (NO. 11) to door and back end posts
(NO.3) at the back end and front end of greenhouse by using screws M5-12 (26) and nuts M5
(29); additionally tighten the back end reinforcement at the back end of greenhouse (NO. 12)
(15 pic).
15 pic.
16. Tighten reinforcement profiles (NO. 7) to side-bottom posts (NO. 3) and top posts (NO.1),
starting at top of reinforcement rail of first-bottom post (NO.5) and finishing with bottom of
reinforcement rail of top second post (NO. 5). Use screws M5-12 (26) and nuts M5 (29) (16
pic).
NOTE: We suggest using one M5-40 screw with all 3 parts: side post, reinforcement
rail of post and reinforcement profile.
Inside
Outside