![Dancover TITAN Dome 320 Manual Download Page 12](http://html1.mh-extra.com/html/dancover/titan-dome-320/titan-dome-320_manual_3496266012.webp)
11
16 рic.
17 рic.
17. Tighten the skylight profile (NO. 13) in between side posts at the point of your choice. Use
screws M5-12 (26) and nuts M5 (29).
NOTE: it is not recommended to place skylight in a
place where two polycarbonate panels go on top of each other (i.e. at posts 4th, 7th, 10th,
13th and so on)
(17 pic.)
18. Because screws were not completely tightened in order to be able to adjust the position of
profiles – next step is to level assembled framework by using leveler tool, check the diagonal
length for a second time and only then cover the pits.
19. Installation of covering.
NOTE: If your greenhouse has additional doors, back end
of greenhouse must be formed without H connecting profile – same as at the front end
(see 21 p.). Assemble the framework of greenhouse, cut polycarbonate according to given
dimensions and attach it to framework. Installation of polycarbonate must be started from
back end of greenhouse. Put side-end part of polycarbonate sheet on framework at the back
end of greenhouse, mark bending radius with marker and cut out a bend. Or you can simply
attach the sheet to framework using screws M5-40 (28), nuts (29) and spacers (31), and then
cut the polycarbonate according to profile of framework by using sharp knife or jigsaw (19
pic).