3. Excavate the pits (25 cm in diameter, 40 cm in depth) for side – bottom posts (NR. 3) at
attachment points in the foundation (3.1 - 3.2 pic).
4. Using screws M5-12 (26) and nuts M5 (29) attach polycarbonate installation plates (22) to
front end and back end parts of foundation (17) (4.1 - 4.2 pic).
5. Preparation of post for placing into ground. Using
screws M5-12 (26) and nuts M5 (29) attach the
parts, that connect post to the ground, to side-and
bottom post (NR. 3), tighten the connecting parts
(NR. 4) (5 pic).
6. Tighten side-bottom posts (NR. 3) to side parts of assembled foundation, using screws M5-
12 (26) and nuts M5 (29). (6.1 – 6.3 pic).