5.Assembling the covers

Before  assembling  the  cover,  all  the  ground  anchors  must  be  placed 

deep and all braces must be installed and clamped loosely. 

Important:

  Do  not  pull  the  covers  with  raw  force,  because  noticeable 

resistance  could  also  indicate  inaccurate  alignment  in  the  assembly.  If 

required, pull back again and try or check the accuracy of the assembly. 

5.1 Roof covers 

5.1.1

 Throw one pulling ropes each from left to right over the ridge of the 

first brace field (image 9 above, page 18), assembly fork will be useful 

here. 

5.1.2

 Pull both the other pulling ropes over the ridge by using this rope. 

5.1.3

 Mount roof covers (image 10, page 20), ensure correct position and 

readjust if needed. 

5.1.4

 Suspend both the pulling ropes into the two outer eyelets of the roof 

cover using snap hooks opening facing upwards. Pull back the 3rd Mount 

pulling rope into the drawbar eyelet as pulling rope (image 10). 

5.1.5 

Lift  the  roof  cover  to  piping  channel  height  by  pulling  the  pulling 

ropes from the opposite side of the marquee and insert the left and right 

piping of the covers into the piping channel of the bar. 

(Image 10, page 20) 

5.1.6

 Place the roof cover into the roof bar at both the pulling ropes with 

uniform pulling.  

Important

 Pull the cover over the ridge in single pull. 

5.1.7 

Once the cover is pulled over bar completely, the two pulling ropes 

will  loosened  and  mounted  in  the  3rd  rope,  which  was  pulled  with  the 

cover over the ridge. Pull back the 3rd rope so that both the other pulling 

ropes are in initial position. 

5.1.8

 Repeat points 5.1.1 to 5.1.7 for other roof covers. 

Summary of Contents for Marquee 10x15 m PRO+ EventZone

Page 1: ...29 06 2016 Manual for Marquee 10x15 m PRO EventZone...

Page 2: ...ng the marquee 015 4 1 Installation of the tie frame 015 018 4 3 Assembling the pediment support 017 5 Assembly of the covers 019 5 1 Roof covers 020 021 5 2 Side and pediment covers 022 023 5 3 Pedim...

Page 3: ...ow accident prevention regulations Ensure that there is no cable pipes etc below the marquee On the structure of this assembly manual Drawings and sketches are used to explain individual steps for the...

Page 4: ...clothing e g gloves to prevent injuries Use the supplied tools for assembly Please note The model approval test log contains requirements specifications conditions and operating instructions for mobil...

Page 5: ...uee Additional Site tools and equipment 3 x towing rope snap hooks load capacity at least 250 kg 2 x ratchet or wrench 2 x ladder 1 x sledgehammer ground anchor impact tool 1 x tape measure 1 x pipe w...

Page 6: ...ng the base plate Wrongly or inaccurately positioned base plates will make further assembly difficult Required assembly tools and materials 2 1 Aligning the base plates Note Keep the ground anchor pro...

Page 7: ...diagonal line between points A and B then the right angle is guaranteed if not the line between the 1st and 2nd base plate should be pushed such that the required dimension is achieved 2 1 9 1 Readju...

Page 8: ...8 3 Preassembly...

Page 9: ...ith the corresponding rail connectors into the bars and bolt with pivot pins 3 1 3 Insert the trusses completely mounted posts and bars into the base plate bolt with foot bolts and secure with clip co...

Page 10: ...10...

Page 11: ...11...

Page 12: ...uld not be exceeded Arrangements of brace fields see Fig 6 Fundamental information on assembly The ropes of the braces should be mounted such that the turnbuckles are always placed at the lower end of...

Page 13: ...13...

Page 14: ...de with straight hook to the second truss with the help of assembly rod Image 8 page 16 4 1 6 Mount the ridge rail to the first truss with curved hook 4 1 7 Mount the ridge rail to the second truss wi...

Page 15: ...15...

Page 16: ...ce the pediment support vertically below the ridge shoe bar of the corresponding end bar and insert into the intake at the ridge shoes and screw Image 5 page 11 4 3 2 Insert pediment support into the...

Page 17: ...17...

Page 18: ...eded 5 1 4 Suspend both the pulling ropes into the two outer eyelets of the roof cover using snap hooks opening facing upwards Pull back the 3rd Mount pulling rope into the drawbar eyelet as pulling r...

Page 19: ...19 5 1 9 Once all the roof covers are fixed in the bars these will be tensioned with corresponding tensionless belt pressure fix expander etc...

Page 20: ...20...

Page 21: ...way down 5 2 4 Assemble the 2nd cover eyelet and loop side in the same way point 5 2 2 and 5 2 3 5 2 5 For curtain rods push through the rings of the side covers and mount in the area of posts into th...

Page 22: ...22...

Page 23: ...last loop image 12 page 22 5 3 3 Place the buckle straps or loop fastener in the lower edge around the crossbeam curtain pipe and close 5 3 4 Repeat points 5 3 1 to 5 3 2 on the opposite pediment side...

Page 24: ...24...

Page 25: ...after the disassembly 6 1 Disassemble foot tubes if available 6 2 Place side and pediment awning on a clean surface and fold 6 3 Remove pediment cover as described in 6 2 6 4 Disassemble roof cover cl...

Page 26: ...amages 7 1 4 If required damaged parts should be replaced immediately with original parts 7 2 Transport and storage In order to prevent deformities and damages to the aluminium profile all the compone...

Page 27: ...30 m Roof incline 20 Truss distance 3 00 m Profile Posts 81 x 48 mm 94 x 48 mm Bar 81 x 48 mm 94 x 48 mm Ridge rail 40 x 35 mm Intermediate rail flex holder 40 x 35 mm eave purlin 60 x 55 mm Material...

Page 28: ...s are made of material with low flammability in accordance with DIN 4102 B1 8 3 DIN ISO standards Marquees are based on the following regulations EN 1090 1 DIN EN 13782 DIN EN 1990 DIN EN 1991 DIN EN...

Page 29: ......

Reviews: