2
1
5.2 Side and pediment covers
The side and pediment covers are placed at the longitudinal side of the
marquee and pediment sides and always consist of loop and eyelet side
(image 12, page 22).
The covers are fixed into the piping channels of the posts and the
crossbeams / curtain pipes.
5.2.1
Match the posts and lay out accordingly. The cover edge with the
rings will always face upward.
5.2.2
Insert the side piping of the cover in the area of slot into the piping
channel of the marquee post from above and push all the way down.
5.2.3
Insert the lower half of the covers similarly and push all the way
down.
5.2.4
Assemble the 2nd cover (eyelet and loop side) in the same way
(point 5.2.2 and 5.2.3).
5.2.5
For
curtain rods
push through the rings of the side covers and
mount in the area of posts into the slot intake at the shaft bar. In case of
marquee versions with pediment support, the curtain rods of the
pediment side should be mounted into the corresponding intakes at the
pediment support (image 11, page 22).
5.2.6
Tie both the side and pediment covers from top to bottom. Insert
the 1st loop through the 1st eyelet, then the 2nd loop into the 2nd eyelet,
then through the previous 1st loop. All the loops and eyelets are tied up
with this method. The last loop should be tied up for safety.
5.2.7
The points 5.2.2 to 5.2.6 will be repeated for all the side and
pediment covers as per the description
.