Rev. 1.0.1 | © 2018 Dallmeier | www.dallmeier.com
29
Commissioning MDF5400HD-DN
A-❾
➡
Observe the chapter “Interfaces” on page 38.
➡
Connect the required cables and finally establish the power supply (via PoE or by an external power supply unit).
The device starts up and is ready for operation after a few minutes.