![Daikin VRV Inverter K Series Manual Download Page 262](http://html1.mh-extra.com/html/daikin/vrv-inverter-k-series/vrv-inverter-k-series_manual_4073997262.webp)
Outline of Control
SiE-05C
248
Functions PLUS Series
4.19
Pump Down Operation
When an outdoor unit is faulty, by fully closing both liquid and pressure equalizing valves and switching to
the service mode, you can conduct pump down operation (max. 1 hour) which purges refrigerant from the
faulty unit. When doing so, all indoor units are turned ON by thermostat. Refrigerant is discharged from the
low pressure line of the faulty unit by cooling with outdoor units that are not faulty up to low pressure
equivalent. Pump down operation is quit automatically after one hour. Just before quitting (when approx. 50
minutes elapse), shut the gas pipe’s stop valve and then stop the outdoor unit. After another 10 minutes
passes, if the pressure in the outdoor unit doesn’t exceed outdoor temperature equivalent pressure, the
process is complete.
4.19.1 Heat Pump System
Pump Down
Operation of INV
Outdoor Unit
First fully close the liquid side and pressure equalizing side stop valves of the INV outdoor unit. The
execute low pressure control by setting indoor unit fan to L or off in accordance with the outdoor
temperature and No. 2 system outdoor unit suction pipe temperature.
Pump Down
Operation of STD
Outdoor Unit
First fully close the liquid side and pressure equalizing side stop valves of the STD outdoor unit to be
pumped down. The indoor unit fan is fixed at L tap.
To pump down refrigerant of STD outdoor unit 1
Normal cooling operation is executed by INV outdoor unit and STD outdoor unit 2 only.
To pump down refrigerant of STD outdoor unit 2:
Normal cooling operation is executed by INV outdoor unit and STD outdoor unit 1 only.
Outdoor unit operation is same as STD outdoor unit 1.
: Operates No. 1 compressors only of STD outdoor unit 1 and 2.
Step 1
Comp-
ressor
Outdoor
unit fan
Outdoor
unit EEV
Hot gas bypass
INV outdoor
unit
STD outdoor
unit 1
STD outdoor
unit 2
0 Hz + OFF
H + ON
500 PLS
ON
ON + OFF
H + ON
2000 PLS
OFF
ON + OFF
H + ON
2000 PLS
OFF
Step 2
Comp-
ressor
Outdoor
unit fan
Outdoor
unit EEV
Hot gas bypass
INV outdoor
unit
STD outdoor
unit 1
STD outdoor
unit 2
0 Hz + OFF
H + ON
500 PLS
ON
ON + ON
H + ON
2000 PLS
OFF
ON + ON
H + ON
2000 PLS
OFF
Indoor units execute
superheating control in this
mode.
l
No. 2 outdoor unit liquid pipe temp.
< 58 C
&
l
5 minutes elapse
STD outdoor unit 2 liquid
pipe temp. > 60˚C
: Operates all compressors of STD outdoor unit 1 and 2.
(VF126)
Comp-
ressor
Outdoor
unit fan
Outdoor
unit EEV
Hot gas bypass
INV outdoor
unit
STD outdoor
unit 1
STD outdoor
unit 2
P I control
H + ON
2000 PLS
OFF
H + ON
500 PLS
ON
P I control
H + ON
2000 PLS
Low pressure
protection control
Low pressure
protection control
Indoor units execute
superheating control in this
mode.
(VF170)
SI-05C.BOOK Page 248 Monday, November 6, 2000 4:13 PM
Все каталоги и инструкции здесь:
http
:
//splitoff.ru/tehn-doc.html